blue house icon
How to compare home builder's prices, quote to quote
Selecting the right mortgage when buying new
How to know when you're getting the quality 
and craftsmanship you deserve
How to avoid costly mistakes and headaches
Top ways to make your home more energy efficient
Tips on building or buying a healthier home
First Name:
Last Name:
Email:
(Kit emailed to you):
Your information is Safe and Secure
?>
Submissions of edits or additions are not guaranteed to be added or applied.
Close

How Long Does it Take to Build a Custom Home?

Image

How long does it take to build a custom home? That all depends. But for the most part, building a custom home will take six months to a year. However the planning of your custom home should take quite a bit longer. It is important to completely research construction methods, and consider many layout ideas, floor plans, and style ideas before you visit your custom home builder, or contractor. We offer a free 98 page guide on home building, which you will find helpful and download at the top right of this page. You should also visit homes for sale and construction sites to learn more about home prices, construction methods and home builders and contractors in your area.

Once you feel you have a firm idea of what you want, and are financially ready to commit to the project, talk with two or three home builders or contractors and how long it will take to build your custom home. These professionals will help solidify your ideas and give you an estimate of the costs. After the costs are established, you must select a builder and procure a loan. Procuring a loan may take weeks or even months. From the beginning of the construction phase it should take about six months to a year to complete.

How Long Does it Take to Build a Custom Home Variables

The exact amount of time it takes to build a custom home depends on the size of the home, the quality of construction, and the amount of specialty features, such as stone work, and custom carpentry. The size of the construction or home building company you employ can also impact the amount of time required. Logically construction is a matter of man hours, so the more people working on your home, and the more experienced and capable those people are, the faster they can build.

Another important variable is the weather. Rain or winter weather can delay construction, while a forecast of stormy weather can force builders to rush. Most construction should be planned in order to get the home under roof before winter or the rainy season. In humid, rainy climates it is imperative to get the home under roof quickly once it is started, while in dryer climates it is less important.

How Long Does it Take to Build a Custom Home Phases
The Phases of construction are generally as follows:
1. Preparing the lot
2. Digging, pouring and laying the foundation
3. Laying the floor’s underlayment
4. Framing
5. Roofing, Sheeting and Siding
6. Sheetrock, flooring, and carpentry
7. Electrical, plumbing, and special electronic features
8. Painting, wallpaper, finish carpentry, cabinetry, and all the finishing touches

Land preparation and foundation work can be set back by wet weather, but it really doesn’t hurt anything if this takes longer than expected due to weather. The only reason to rush any phase of construction is the time between phase 3 and phase 5. Framing and subfloor should not be exposed to the elements for extended periods of time during rainy weather or damp conditions. Therefore in wet climates building contractors should try to get the home under roof quickly. Once that is done, the rest can be taken more slowly. Ideally phases 3-5 should be done during the hot dry summer months for many reasons. Asphalt shingle roofing seats better in the hot summer sun, during the dry season. Similarly it is best to get the siding up while it is warm and dry. While the summer sun is hot, most workers will prefer working outside in summer more than winter. Therefore phases 3-5 once started should be completed as quickly as possible, preferably during the summer, and hopefully it will not rain much during this period.

Once the home is under roof effort should be made to sheet the house in plywood and then apply siding to the house as soon as possible. Once the house is enclosed homeowners may become more involved in selections, and the rest of the work is at a more relaxed pace. This process is likely to be a lot of fun for the home buyer who will enjoy making these smaller décor decisions. From the point the home becomes enclosed, the question “how long does it take to build a custom home?” is virtually answered, because essentially the house is built, and only the fun and exciting details remain.

Let’s recap…

How Long Does it Take to Build a Custom Home Overview:

1. A custom home build will take six months to a year. However the planning of your custom home should take quite a bit longer.
2. Talk with two or three home builders or contractors.
3. Get estimates and select a builder.
4. Procure a loan.
5. The time it takes to build a custom home will vary based on size of the home, the quality of construction, and the amount of specialty features, and weather.
6. Construction will normally be completed in phases starting with prepping the lot and ending with painting and finishing touches.
7. Get as educated as you can on home building timelines and the overall home building process. Download the free New Home Steps Guide above and become smart on home building from start to finish.

Let me know if you have any questions. I hope you this article on how long does it take to build a custom home useful.